Pro 33/11 KV Transformer & Control Room for Sub Stn
Project Description
The project involves the design, supply, installation, and commissioning of a 33/11 kV transformer and the construction of a control room for the substation. This facility will serve as a critical part of the electrical distribution system, stepping down the voltage from 33 kV to 11 kV to ensure efficient power transmission to local areas. The project also includes the provision of the necessary electrical equipment, control panels, protection systems, and auxiliary services required for the safe and reliable operation of the substation.

Client
Kenya Power and Lighting Co. Ltd
Categories
Civil works, Electrical works
Key Components:
1. 33/11 kV Transformer:
- High-capacity transformer for voltage step-down from 33 kV to 11 kV.
- Suitable for handling expected loads with efficient energy conversion
- Equipped with tap changers, protection relays, and other necessary components for safe operation.
2. Control Room:
- Construction of a dedicated control room for monitoring and controlling substation operations.
- Includes installation of control panels, SCADA systems, and protection relays.
- Provision of HVAC systems for maintaining optimal working conditions.
3. Electrical and Protection Equipment:
- Circuit breakers, isolators, busbars, and switchgear to manage and protect the electrical system.
- Protection and metering systems to ensure reliable operation and fault detection.
4. Civil Works:
- Site preparation, foundation work for the transformer and control room.
- Access roads, drainage systems, and fencing around the substation for security and safety
5. Safety Systems:
- Earthing systems, fire detection and suppression, and other safety measures to ensure the integrity of the installation and the safety of personnel.
6. Commissioning and Testing:
- Final inspection, testing, and commissioning of all equipment
- Training for operation and maintenance staff.
Objectives:
- Reliability: To provide a stable and reliable power supply to the local distribution network.
- Safety: To ensure the safe operation of the substation and minimize any risks associated with electrical faults.
- Efficiency: To ensure efficient power distribution with minimal losses through modern transformers and equipment.
- Automation: Incorporation of modern SCADA systems for real-time monitoring and control, enhancing operational efficiency.
Related Projects
Governor’s residence in Kamariny Showground for County Government of Elgeiyo Marakwet
- Building Construction, Civil Works
Improvement of Mathare Access 3 Rd
- Civil Works, Road Works
Routine Maintenance of Kasarani-Mwiki Rd NR/RM/2012/13
- Civil Works, Road Works
Excavation of Heavy Grading and Gravelling works on Majengo C44 Rd
- Civil Works, Drainage Works, Road Works
We don’t just deliver services—we build lasting relationships with our clients