Improvement of Mathare Access 3 Rd
Project Description
This project involves the upgrading and improvement of Mathare Access 3 Road, located in the Mathare area of Nairobi. The road is crucial for local mobility, providing access to residential areas, businesses, and essential services. The goal of the project is to enhance the road’s infrastructure to improve traffic flow, reduce congestion, and ensure safety for pedestrians and motorists. The works will include road resurfacing, drainage improvements, installation of street lighting, and the construction of walkways.

Client
The Kenya Rural Roads Authority
Categories
Civil works, Road works
Key Components:
1. Site Survey and Assessment:
- Conducting a thorough survey of the existing road conditions, including traffic flow, drainage, and structural integrity.
- Identification of areas that need significant repairs or redesign, such as damaged road sections, drainage problems, or areas prone to flooding.
2. Road Resurfacing and Grading:
- Excavation and removal of damaged road surfaces, followed by grading to ensure proper road leveling and drainage.
- Application of a new asphalt layer or concrete surface to provide a durable, smooth driving surface.
- Compaction and stabilization of the roadbed to enhance load-bearing capacity and extend the life of the road.
3. Drainage System Improvement:
- Construction of drainage ditches, culverts, and stormwater drains to prevent flooding and ensure efficient water runoff.
- Installation of new or improved drainage infrastructure to protect the road from water damage.
- Erosion control measures to prevent soil loss along the drainage channels.
4. Pedestrian Walkways:
- Construction of well-defined pedestrian walkways to enhance safety for pedestrians, especially in densely populated areas.
- Use of durable, non-slip materials for the walkways to ensure safety in all weather conditions.
- Proper demarcation of pedestrian zones to separate foot traffic from vehicular traffic.
5. Street Lighting and Signage:
- Installation of modern streetlights to improve visibility and safety during the night.
- Placement of traffic signs, road markings, and speed bumps where necessary to ensure smooth traffic flow and safety.
- Integration of reflective road markings to enhance visibility for motorists and pedestrians
6. Final Inspection and Quality Control:
- Testing and inspection of all road systems, including the road surface, drainage, and safety infrastructure, to ensure they meet engineering standards
- Final cleanup of the site and removal of construction debris
Objectives:
- Improved Traffic Flow: To reduce traffic congestion and ensure smoother traffic movement through the Mathare Access 3 Road.
- Safety Enhancement: To improve road safety for both motorists and pedestrians through better signage, walkways, and lighting.
- Flood Prevention: To reduce instances of flooding and water damage to the road by upgrading the drainage systems.
- Economic Development: To provide better access to businesses and residential areas, fostering local economic growth and improving overall accessibility.
Related Projects
Pro 33/11 KV Transformer & Control Room for Sub Stn
- Civil Works, Electrical Works
Governor’s residence in Kamariny Showground for County Government of Elgeiyo Marakwet
- Building Construction, Civil Works
Routine Maintenance of Kasarani-Mwiki Rd NR/RM/2012/13
- Civil Works, Road Works
Excavation of Culvert and Drainage Works on Enkonjero-Mulufu-Matioli Rd
- Civil Works, Drainage Works, Road Works
We don’t just deliver services—we build lasting relationships with our clients