Improvement of Posta Road, Ngamia Road, and Biashara Street
Project Description
This project involves the upgrading and improvement of three key roads in Nairobi: Posta Road, Ngamia Road, and Biashara Street. These roads are crucial for transportation, commerce, and accessibility within Nairobi’s central business district (CBD) and surrounding areas. The objective of the project is to enhance the road infrastructure by improving the road surface, drainage, traffic management systems, and pedestrian facilities. This will ensure a smoother, safer, and more efficient travel experience for both pedestrians and motorists while promoting business activity and reducing congestion.

Client
The Kenya Urban Roads Authority
Categories
Civil works, Road works
Key Components:
1. Road Resurfacing and Grading:
- Excavation and removal of damaged or deteriorated road surfaces.
- Resurfacing with high-quality asphalt or concrete to create a smooth, durable road surface.
- Grading of the road to correct uneven surfaces, improve alignment, and ensure proper water runoff for drainage.
2. Drainage Improvement:
- Upgrading the drainage system to prevent flooding and water damage to the roads.
- Construction of new stormwater drains, culverts, and catch basins to manage rainwater efficiently.
- Cleaning and repairing existing drains to restore their full capacity and functionality.
3. Pedestrian Walkways:
- Construction or improvement of pedestrian walkways along the roads to ensure safety for foot traffic.
- Use of durable, slip-resistant materials to provide safe walking paths for pedestrians.
- Installation of proper curbing and demarcation between pedestrian walkways and vehicular lanes to prevent accidents.
4. Street Lighting:
- Installation of modern streetlights to improve visibility and safety at night.
- Ensuring that the lighting system is energy-efficient and well-distributed across the roadways and pedestrian areas.
- Regular inspection and maintenance of the lighting system to ensure continuous functionality.
5. Parking Facilities:
- Creation or improvement of designated parking spaces to manage on-street parking and reduce congestion
- Installation of parking meters or signage to regulate and monitor parking.
6. Road Safety Features:
- Installation of speed bumps, rumble strips, or traffic-calming measures in areas prone to speeding or accidents.
- Enhanced road safety features such as pedestrian crossings, bus stops, and drop-off zones, especially near public buildings and commercial areas.
Objectives:
- Enhanced Road Safety: To improve the safety of road users, including pedestrians, cyclists, and motorists, through the provision of proper walkways, road markings, and signage.
- Traffic Efficiency: To reduce congestion and improve traffic flow in the central business district and surrounding areas by upgrading the road infrastructure and traffic management systems.
- Business Accessibility: To improve the accessibility of businesses along Posta Road, Ngamia Road, and Biashara Street, promoting economic growth in the area.
- Flood Prevention: To mitigate flooding risks by upgrading the drainage systems and ensuring proper water runoff from the roads.
Related Projects
Pro 33/11 KV Transformer & Control Room for Sub Stn
- Civil Works, Electrical Works
Governor’s residence in Kamariny Showground for County Government of Elgeiyo Marakwet
- Building Construction, Civil Works
Routine Maintenance of Kasarani-Mwiki Rd NR/RM/2012/13
- Civil Works, Road Works
Excavation of Culvert and Drainage Works on Enkonjero-Mulufu-Matioli Rd
- Civil Works, Drainage Works, Road Works
We don’t just deliver services—we build lasting relationships with our clients
